Engie

Realized projects

28 November 2017
Braster

Braster

25 November 2017

Nexi Industries

20 November 2017
Engie

Engie

27 October 2017
Zign medical

Zign Medical

28 September 2017
Findt

Findt

Engie

The challenge

Engie offers its customers a system for real-time insight into their energy consumption. Engie was looking for an energy sensor that can read the consumption of electricity and gas from all types of gas and electricity meters. The major challenge was to support all types of meters, in excess of 1.000 different types ! Other critical system requirements were an easy installation procedure for all consumers and a battery life time of several years.

What we did

This project was characterized as a real Research and Development assignment. Engie assigned us early on in the development process. After analyzing the different types of meters, we explored and validated various solutions with prototypes. We further developed the best concept into a prototype and validated on the basis of a large field test. The prototype was subsequently made suitable for mass production.

The result

Our unique energy sensor enables Engie to provide its customers with a unique service in the energy sector. Thanks to our solution, Engie now has an energy sensor which works with any type of meter at a low cost price and very low energy consumption. Currently, the patent for this sensor is pending.

  • Jeroen Bakker

    “The team at ZIGN Innovations, headed by CEO Nico Drost, does an amazing job when it comes to PCB design and embedded software. With their creativity and persistence we produced the award winning NEXI Industries pedalboard for guitarists: the Solution. Due to the help of ZiGN innovations, we made the impossible possible!”
    Jeroen Bakker, Founder, NEXI Industries

  • Michal Biernat

    “In cooperation with Zign Innovation, we produced the Braster Device for in-home breast cancer examination. Thanks to their expertise on electronics and product development, as well as their professionalism and commitment, we went from scratch to mass production in less than 11 months. Zign is the company you can rely on in every aspect. They never let you go unsatisfied.”
    Michal Biernat, Product Development Manager, Braster S.A.